Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Fabricated BDF fire water tank

Fabricated BDF fire water tank
Fabricated BDF fire water tank
Fabricated BDF fire water tank

Larger photo of automa dispenser

Company:Yancheng Kanazawa Water Equipment Co., Ltd. (Jianhu Cor..
Information Name: Fabricated BDF fire water tank
Update Time:2015-04-18
Validity:30
Specifications:Fabricated BDF
Quantity:10000.00
Price Description: RMB/
Inquire Now
 There are a lot of people do not understand the BDF water tank assembly, I am often asked recently fabricated tanks and general common stainless steel tanks where there is not the same? Because a water tank assembly, high cost, and second, the industrial complex, so the production of fabricated tank manufacturers on the relatively small, people will not take much. Today I published this article is to resolve all questions. Our company is located in Yancheng Kanazawa Water Equipment Co., Ltd. production of stainless steel tanks Township, located 1 km Jiangsu Province Jianhu Wuzhou International City westward manufacturers: stainless steel tanks, bolted (BDF) fabricated tanks, one tank pump of the ground and buried tank pump integration, stainless steel stamping plates, fire pumps, variable frequency negative pressure water equipment, factory outlets, the price is reasonable. Recruitment agents around Contact: 15365792102 Xu Yanli now tell you that the difference between me and the next ordinary stainless steel water tank assembly and the tank at the first ordinary tank is welded, and assembled the tank is connected by bolts made , water tank assembly, a total of three kinds, the first material: galvanized steel, molding, stamping each block has molded panels bolted together. The second we called pure water tank assembly is 304 stainless steel, molding, stamping each block has molded panels bolted together. The third is from 3mm 0.4mm galvanized steel and stainless steel composite molded, we usually call BDF water tank assembly. Construction program and the general assembly of stainless steel water tank water tank is not the same, here I plan to introduce under construction fabricated tank. Water tank assembly construction program to ensure that water tank assembly to high standards in the production process to meet the design requirements, the Company in accordance with the Jiangsu Province and Technical Supervision issued corporate standards, the implementation of decision: Q / 320925YCKL01-2009. Tank size: 18m × 12m × 2.5m = 540m3 Sheet Size: 2.0mm roof side 3.0mm / 3.0mm / 3.0mm 3.0mm bottom water tank assembly instructions a material, stainless steel sheet: SUS304 2, stainless steel bolts: 3, stainless steel pipe receive grades: Icr18Ni9Ti 4, stainless steel flanges grades: HG5010-50 water tank assembly materials and manufacturing process technology requires a stainless steel sheet in accordance with: the requirements of GB / T3280's. 2, stainless steel ladder (RHS) conform: JGT / 3030-1995 standard. 3, the connection between the mounting plate by a stainless steel tank rubber seal ring and stainless steel bolts are screwed together. Prepare a water tank assembly construction, familiar with the requirements of the drawings. 2, the statistical material in accordance with drawings preparation. 3, the organization of construction workers, the detailed implementation of the project leader and completed the job situation in the field of work safety technical tests. 4, with a good check on the construction equipment and labor protection. 5, the project manager and construction site supervision and inspection departments for the transfer of equipment foundations. Water tank assembly quality assurance measures a quality person in charge of the scene to track, monitor and strictly enforce GB / T1991-2000ISO9001: 2000 quality management principles. 2, in strict accordance with the drawings and make a record of each self-test procedure. 3, the project leader in four regulatory authorities towards engineering inspection, construction materials and semi-acceptance inspection → → finished acceptance. 4, the quality objectives: excellent pass rate of 100% over 95%. Water tank assembly construction process: under the floor laying floor materials → → → backplane connector side plates connecting the junction material → → → side floor under seal inspection seal inspection under roof material → → → roof laying a roof connections, according to the water tank specifications Model design requirements, the plant uses water tank assembly plate is molded and made a dash to draw a good line on the plate shears to cut 106 × 106cm square. Plate good cut, then cut the corners , each corner cut 90. Angle, and then sent to a hydraulic machine molded into a 100 × 100cm and 50 × 50cm plates bump, bump plate flange is 90. 2, after the material enters the scene, the first combination of molded plates were assembled using bolts and seals on the plate sealed connector technology, according to the tank size length × width × height were bolted connection, the combination of a good plate molded together into a water tank several large board or the briquetting press tank combined length and width or height bolted a few minutes, the last one level to the top of the tank bolted connection, according to the construction site to display their site operation may be. 3. After a few big board assembly combination, should do the bottom assembled ready to connect, when bolted tank floor, first floor of the tank size is good, then the basis of the tank above the floor cloth seal good connection, bottom connection, to seal Oil testing or visual inspection carried out, to prevent the seal is not strong and so on. 4, after the backplane connectors, wall and floor were connected, bolted the first good news on the side of the side of the tank bottom yards, four yards after a good wall, pressing edges to adjust the connection, complex foot generally does not exceed the relative angular 2mm, Requirements in a straight line, the bottom corners and wall joints require 90. 5, after the tank bottom and walls with bolts and seals tight connection, and then connect the top and the wall, edge to edge basic requirements in a horizontal line. Tank manhole connections according to customer requirements in the specified location, generally located in close proximity to float at the water hole. 6, water sealed box after connecting, and then entered the water, water, spills, sewage, fire-hole, and finally close the manhole near the escalator installation. 7. stretch inside the box, made of stainless steel, the knuckle machine into 90. Cartesian angles and channels connecting the tank interior, mainly from the strengthening of the role of the tank to prevent distortion, channel reinforcement is welded to the bottom of the tank to the top of the support between. Stretch is connected from the bottom upwards at 50cm layer, the first layer vertical and horizontal spacing of 1m × 1m, the second layer from the first layer 50cm, height, and spacing so on. The wall and the wall, between the wall and floor, wall and roof connecting angle. 8, after the end of the work, such as site conditions have to test the water, water pressure test conducted on the tank, check the seal around the tank, there is no leakage or seepage phenomenon. 9, off cleaning, tank heads and supervision by the owners after acceptance, delivery. Note: The above scheme Kanazawa Water Equipment Co., Ltd. Yancheng water tank assembly manufacturers Technology research production, approved by the company shall not be copied without my learning. (BDF) fabricated tanks, stainless steel tanks, stainless steel tanks stamping plates, boxes integrated pump manufacturer Contact: Xu Yanli 15365792102. fabricated stainless steel water tank BDF I. Features: imported material will never rust selection of imported food grade stainless steel plates, corrosion resistance, and can effectively reflect the sun's rays, not long moss, keep the water clean. Light weight. Price Low-forming process using the stamping process of production, the unique plate, with a minimum of material consumption to achieve high strength requirements. Only one-third the weight of ordinary steel tank, the price close to ordinary steel tank. Unique design never leaks unique design, all-welded, high-strength, with different bolt structure, eliminating the seal, not leaking and Mifengbuyan phenomenon. Second, the scope of industrial and civil buildings and live in cold water, hot water, fire water, such as water supply and storage, the use of system expansion tank condensation. Sewage treatment tank water industry's original water tank, middle Roadway, water tank, environmental protection equipment. Food and beverage, pharmaceutical and chemical industries have a reservoir tank supplementary boiler industry, holding tanks. Solar air heat pump with a matching tank insulation and other energy. Third, the design selection and installation of points: life, industrial water tank calculated according to national norms solvent design. If fire protection requirements, the solvent according to the current national fire codes designed tank with live fire water pipes should be higher than the water level, to ensure the reliability of the fire service. Around the tank should be left to repair the space of not less than 500mm, the top surface of the tank to the roof distance of less than 400mm. With a minimum of material consumption, to achieve the best strength through material deformation method, this process for the production of tanks assembled out of the square linear and smooth, three-dimensional feeling good and can amenity; this tank is made of SUS304 or SUS316L, resistance corrosion resistance, good seismic performance, easy to transport, no heavy lifting equipment, different can be assembled on site; clean, compared with the traditional tanks, supplies low, high structural strength, can really do a hundred years is not bad, the water tank New Wave sector; hot and cold holding equipment used to provide more ideal. Assembled stainless steel tank provides reinforcement assembly and welding of technical guidance. 
Contact Detail
Company Name: Yancheng Kanazawa Water Equipment Co., Ltd. (Jianhu Cor..
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Xu Yanli(Director of Sales)
Telephone Number: 15365792102
Company Address: Jianhu Jianyang Industrial Park, No. 21, Yancheng City, Jiangsu Province, China
Zip/Postal Code: 224700
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450