Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Jining epoxy floor paint factory sales, Jining how do professional epoxy floor paint

Jining epoxy floor paint factory sales, Jining how do professional epoxy floor paint
Jining epoxy floor paint factory sales, Jining how do professional epoxy floor paint
Jining epoxy floor paint factory sales, Jining how do professional epoxy floor paint

Larger photo of automa dispenser

Company:Building Material Co., Ltd. Henan Shiyuan
Information Name: Jining epoxy floor paint factory sales, Jining how do professional epoxy floor paint
Update Time:2015-04-17
Validity:30
Specifications:25kg / barrel
Quantity:1000000.00
Price Description: RMB/
Inquire Now
Product Name: Epoxy paint for the region: National Model: 128 resin products in South Asia Brand: World source Keywords: thin coating of epoxy flooring, epoxy mortar floor, epoxy floor, anti-static floor Category: Epoxy Floor Coatings Company Name: Henan Shiyuan Building Materials Co., Ltd. Address: Zhengzhou City Road neighborhood offices IMF Liulin village on the 28th company Zip: 450000 Contact: Mr. Liu Contact: (1297728721) ring Ping a system characterized by oxygen thin coating to a thickness of 0.5-0.8mm; 2, the general life of 3-5 years. 3, suitable for industrial plants, offices, supermarkets, car parks and other places in the cement (concrete), terrazzo, on the basis of the ground emery old painting. Second, the performance characteristics of a surface paving process seamless, beautiful and bright, color variety, no dust, easy to clean; 2, excellent wear resistance, corrosion resistant mild chemicals. 3, epoxy floor coating thin quartz sand mixed with the epoxy-coated scratch mortar trowel or roller as the middle material, can well improve the flatness of the ground, and can enhance the coating thickness. 4, economical and practical, quick construction and easy maintenance. Third, the construction of conservation: For new concrete floor or a new terrazzo floor, the conservation of more than 28 days, the moisture content of 8% or less. Strength: C-20 above. Moisture content: 8% or less. Flatness: 2-3mm / 2M or less. Indoor humidity of 85%, the best construction temperature above 10 ℃. Fourth, construction tools Floor grinding machines, vacuum cleaners, serrated trowel, flat scraper, roller and paint brush, mortar mixer, the substrate surface temperature and ambient temperature and humidity, substrate moisture analyzer, weighing and mixing tools cut sewing and glue gun, cleaning tools. V. Construction Technology 1, Su handle: according to the situation plain good repair, sanding, dust; 2, epoxy primer: use of an exceptionally strong adhesive closure and roll an epoxy primer to enhance the surface adhesion; 3, Epoxy coating: epoxy resin adding an appropriate amount of quartz sand, with a trowel to evenly coated with the number of road; 4, epoxy approved soil: according to the actual needs of the number of road construction, required to achieve smooth and no holes, no batch of knives India and sanding print prevail; 5, epoxy topcoat: solvent-based epoxy paint or paint roller two slip road, after the completion of the overall surface bright and clean, color uniform, no hollowing; 6, the construction is completed: 24 hours before the Master, seven days before the weight. (25 ℃ prevail, low opening time to be appropriately extended) six, Construction Notes 1, basic floor sanding, repair, cleaning up after the strength of the foundation in the ground up to C25 or more, within the flatness of 2-3mm / 2M, ground no oil, other chemicals residues. 2. After each coat finish is applied to detect the surface conditions note, there is no ills generated every construction easy too thick a coat, construction efforts in uniform, after must be completely cured before they can enter the next process. 3, the required floor paint material standard ratio ratio, stir evenly. Seven pilot projects technical indicators index drying time, H dry (H) drying time, H dry (H) time of hard work (H) adhesion, pencil hardness grade ≤1 ≥2H impact resistance, Kg · cm 50 through flexible by abrasion of 1mm (750g / 500r, weightlessness, g) ≤0.04 Water resistance 48 hours no change Resistance 10% sulfuric acid did not change significantly resistant to 56 days 56 days 10% sodium hydroxide unchanged resistance to gasoline, 120 # 56 days was significantly No change No change-resistant lubricants 56 days Note: All tests (except for drying time) is at 7 days after curing (25 ℃ eight, the scope of electrical appliances, electronics, machinery, food, chemicals, tobacco, beverages, textiles, clothing, furniture, plastics, sports goods and other manufacturing factory floor cement or terrazzo floor. Nine, conservation introduce a recommended pedestrians to wear soft-soled shoes (if site conditions allow), before entering the industrial floor area to be cleaned, such as clean sand on the hard soles pledge to reduce scratches and sharp objects on the floor surface. 2, moving objects try to make light move gently to prevent heavy impact the ground, to avoid man-made damage. 3, Epoxy workshop on the road to Note that speed can not be too fast, so as not to compete brakes caused by the behavior of shear heat is too high, so that the epoxy floor paint instantly softened (epoxy floor paint softening temperature of about 80 ℃, so the use of the environment temperature control in 50 ℃ below) and produce difficult to clean dirty under the action of shear forces. 4, available daily cleaning floor cleaning machines or wipe a wet rag, you can choose a neutral detergent, ordinary detergent can also be used in smaller concentrations join cleaning solution made of water, and then use the dirt floor cleaning machines or wash cloth to mop the floor surface and wash again with water, dry ground; note floor paint edge section 5 do not have water for a long time, no. waxing regularly (generally once a month to waxing), recommends using a dedicated floor wax or water-based wax emulsion; first use of floor cleaning machines or cotton swab to clean and wipe the floor, then hit waxing. wax treatment can increase the wear resistance of any flooring materials and scratch resistance. 6, avoid using heavy tools or tap the ground, can not be directly on the epoxy floor dragging heavy objects. 7, to avoid heavy corrosion medium long soak floor paint, corrosive acid spilled if not careful, please be sure to promptly clean up acid medium. 
Contact Detail
Company Name: Building Material Co., Ltd. Henan Shiyuan
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Zhao(Business Manager)
Telephone Number: 0371-55081191
Company Address: Jinshui Garden Road DrayTek international 2-358, Zhengzhou City, Henan Province, China
Zip/Postal Code: 453000
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450