Home
Products
Baoding polymer binder polymer binder sales price applicable to interior and exterior concrete, plaster base, brick surface
Baoding polymer binder polymer binder sales price applicable to interior and exterior concrete, plaster base, brick surface
Baoding polymer binder polymer binder sales price applicable to interior and exterior concrete, plaster base, brick surface
EC polymer adhesive Product Features This product is a polymer-modified cement-based tile adhesives and special adhesives, operating performance of its construction, bonding performance than traditional cement mortar has greatly improved. Has good resistance to falling property; no need to dip brick, quick construction; thin-layer construction, reduce weight; strong adhesive, easy hollowing; non-toxic environmental protection, weather, water resistance. Scope 1, applies to the interior and exterior concrete, plaster base, brick walls, masonry substrates paste marble, natural stone, mosaic, tile, ceramic tile, quarry tile and so on. 2, suitable for long-term immersion in the bath, pool and other occasions. Executive Standard: JC / T547-2005 items subject to inspection results of the technical indicators of the original tensile adhesive strength, tensile adhesion strength Mpa 0.8 ≥0.5 after flooding, the tensile adhesive strength Mpa 0.9 ≥0.5 after thermal aging Mpa 0.8 ≥ 0.5 Tensile adhesion strength after freeze-thaw cycles, Mpa 0.8 ≥0.5 open time, 20min adhesive tensile strength, Mpa 0.7 ≥0.5 a base surface treatment, all of the base surface should be solid, dry, clean, no shaking, no oil, wax stains, concrete curing agents and other loose material. 2, the base paint should be rough, exposed at least 80% of the original substrate. 3, the new concrete surface should conserve at least 28 days before paving. 4, the new plaster base surface should be at least seven days before paving conservation. 5, the old concrete or plaster base can use industrial detergent or degreaser to clean, then rinse with water cannons. After 24h the surface to dry before tiling. 6, remove the concrete surface residue, especially on the inclined flat plate remaining concrete release agent. 7, in water absorption substrates or at high temperatures, dry conditions, before construction must first wetting the base surface. Preparation of a material, the mixing ratio of the product with water per 25kg ± 0.5kg (a whole pack) polymer adhesive with water 6.25L to 6.5L. 2, stir, add water, then pour the first polymer binder, use an electric mixer to stir the water and polymer binder into a uniform paste and let stand 5 to 10min and then stirred again what you can use. 3, if a stirred solution of the polymer binder by weight less than 5kg, may also be manual stirring manner. Construction Technology 1, with a tooth scraper the stirred polymer adhesive coated on the work surface, so that a uniform distribution, and to a toothed bar. Every coated area of ??about 1m2 (depending on the weather temperature), and then in the open time will rub the stone or tile can be pressed on the work surface. 2. Select the size of the tooth scraper should consider the degree of flatness uneven brick face and back of the board. 3, if the back of the brick panels fissure deep or stone, brick panels larger and heavier, you should take the back face in marble and brick clay coated plate while the way for construction. 4, no nails paste stone facade, stone area should not be greater than 400mm × 400mm, thickness should not exceed 20mm. If the stone thickness 18mm or less, the area can be magnified accordingly. Area and thickness exceeded, or quality, specific weight of the stone, the need to do first scene paste trials to determine whether it is appropriate to take no nails Paste. Packaging and storing 1, Packing: 25kg ± 0.5kg / bag. 2, non-toxic, odorless, non-flammable, non-explosive, according to general cargo transportation, shelf life of 12 months, one-time run out after opening the bag.
Contact Detail
Company Name: | Beijing Sheng Chi-made afternoon Construction Co., Ltd. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Li Peilong(Manager) |
Telephone Number: | 4000820377 |
Company Address: | Changping District Technology Park Road 1 Liangshuihe, Beijing, Beijing, China |
Zip/Postal Code: | 102200 |
Find More Related Products
- Renqiu 150W tunnel lamp out..
- Supply of 17-7PH 0.1-0.5 th..
- Frozen rabbit row
- Chifeng Chifeng pheasant ph..
- Iran 2015 International Bui..
- Titanium peg board display
- Qingdao Qingdao to Tai'an h..
- Zhenjiang basement plugging..
- Tony Quintana pain points P..
- Kunming where there are rea..
- GB sevelamer carbonate cont..
- Shanghai air cargo agent im..
- How to restore sagging brea..
- Shenzhen pastry pastry trai..
- Transportation equipment wh..
- Tony Quintana pain points w..
- Shenyang ZDG self-balancing..
- Frozen rabbit tenderloin
- Do school official bathing ..