Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Acrylic stadium project | Camry sports (certified) | Shaanxi Stadium

Acrylic stadium project | Camry sports (certified) | Shaanxi Stadium
Acrylic stadium project | Camry sports (certified) | Shaanxi Stadium
Acrylic stadium project | Camry sports (certified) | Shaanxi Stadium

Larger photo of automa dispenser

Company:Dongguan City Camry Sports Facilities Engineering Co., ..
Information Name: Acrylic stadium project | Camry sports (certified) | Shaanxi Stadium
Update Time:2015-04-10
Validity:0
Specifications:Limited
Quantity:
Price Description: RMB/
Inquire Now
 Mixed plastic runway construction: 1. plastic track surface construction process: determining the scope of construction → → Clean underside of the base foundation leveled primer → → brushing waterproof plastic timber buffer layer detection → → → surfaces Scratch Repair spray and sprinkle colored EPDM granules crossed → → acceptance. 2. Mix plastic runway construction process: (1) entering first determine the scope of construction, well marked. (2) First base for cleaning floor, a period of time after completion of the cleaning of the site to dry thoroughly. (3) For the uneven ground (water districts) fill level. (4) the need to cement the basis for water treatment, the use of roller layer of waterproof material, waterproof material per square reference amount 0.15-0.2kg. (5) maintenance cured 24 hours, you can track the underlying paving After curing waterproof material, the use of two-component glue, PU material with a particle diameter of 3-4mm high elastic black rubber stir evenly mixed, then the whole uniform paving plastic buffer layer. (6) Construction paving plastic buffer layer after layer of detection of these data to ensure the overall quality of the project. (7) to detect problem areas repair process can be carried out only after the deal with the construction of the next process. (8) curing the maintenance needs of more than 48 hours (under normal weather conditions), can then be carried out in accordance with the construction site were crossed runway standard specifications. (9) Clean, finishing the construction site after the evacuation. (10) after the completion of all field maintenance 15 days can be put into use. Camry Sports - Sports Facilities stop service experts I produced breathable runway general use professional paver, flatness has been effectively controlled, plus upper layer using a professional sprayer with spray polyurethane glue content is also high, so the surface layer of silicon compared with other types of runway pu stadium project, fastness is relatively large, the basic need for maintenance during use, greatly reducing maintenance costs. Elastic layer breathable runway recycled scrap tires and other rubber material crushed into particles paving, reducing the "black pollution", and make a contribution to environmental protection. Basic requirements: breathable plastic runway to the use of cement concrete foundation, foundation requirements should have a certain strength and stability. Or may not have cracks and freezing due to uneven heaving caused by the high water content of the formation still need to add cushion needed basis thickened or measures taken to prevent frost in cold regions according to local geological conditions. General requirements for cement concrete thickness is about 120-150mm, 3 m straightedge flatness error does not require more than 3 mm, the strength required to achieve the above C20 acrylic site engineering, slope surface to the outer edge of the inner self plastic runway edge (gutter) put 6 ‰ -10 ‰ slope, it is recommended to do 8 ‰ appropriate. Cement concrete at intervals of not more than 6 meters should be cut sew, sew recommend 4-5 Mitch, cement concrete curing period as proposed by the standard curing period of 28 days. In the case of poor flatness is prohibited to do with pure cement mortar leveling layer of skin type, should be left to deal with when the surface construction. Construction Technology: Brush evenly with a brush to single-component glue or cement foundation primer. Before primer uncured, the single-component glue and black rubber granules according to a predetermined ratio ratio, with a mixer stir silicon pu badminton, transported to the paving site, as required by the paver paving thickness; cured , becomes elastic layer. Breathable surface with spray glue and EPDM rubber, EPDM powder ratio according to a predetermined ratio, stir, pour a dedicated sprayer, clockwise and counterclockwise points twice to three times spraying, curing and for slip resistant layer of color is now widely used for the red and green. Acrylic stadium project | Camry sports (certified) | Shaanxi course offered by Dongguan Camry sports facilities Engineering Limited. Dongguan City Camry Sports Facilities Engineering Co., Ltd. (www.kmtyss.com) is Dongguan, related products leader, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the Camry sports leadership with the staff warmly welcome all inquiries negotiations to create Camry sports a better future. 
Contact Detail
Company Name: Dongguan City Camry Sports Facilities Engineering Co., ..
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Chen()
Telephone Number: 0769-81781088
Company Address: 78 Long Pond Community third mayor Dongguan City Industrial Zone, Dongguan City, Guangdong, China
Zip/Postal Code: 523000
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450