Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Plane masks automatic production line

Plane masks automatic production line
Plane masks automatic production line
Plane masks automatic production line

Larger photo of automa dispenser

Company:Dongguan City Yuda Machinery Factory Express
Information Name: Plane masks automatic production line
Update Time:2015-04-07
Validity:30
Specifications:6700 * 3100 * 1680MM
Quantity:1.00
Price Description: RMB/
Inquire Now
KYD-MF007: Mask Automatic Connection Machine Auto-line Mask Welding Machine Brief Description: The Connection Machine is a fully automated approach to automatic ultrasonic fusion machine production masks ear with the finished product. From feed production and distribution of the mask body to body, with a complete fusion ear. So as to reduce and avoid artificial respirator secondary pollution. Description: KYD-MF007 use ultrasound to produce finished masks automatically in order to reduce labor and avoid secondary pollution No need any operation by manpower Machine Size Machine Size:.. 6700 * 3100 * 1680MM output Output: 80-95pcs / min Weight Machine Weight: 1600KG Voltage Voltage: 220V or according to customer requirements or Customized Power Power: 11KW Pressure Pressure: 6kg / cm2 Body material Body Material: Aluminum Rustless aluminum alloy control Control Mode: PLC (programmable logic controller) detection method Testing Method : Optical detection Photoelectric Detection Remark Remark: can configure the machine Equipments can be customized according to customer demand for our service and warranty service work into the following steps: After the mechanical installation is completed, the factory training at work and on the mechanical aspects The inspection work in customer technical staff fully understand and are familiar with the case of mechanical operational performance, in recognition of the machinery, mechanical party can leave the factory. Factory machinery to reach customers at the same time, our engineering staff must be within the same day of arrival, installation and commissioning work, installation is completed, the customer must be under mechanical recognition (subject to acceptance of a single client machine signature), the before leaving. Our method of mechanical parts for maintenance, as: In this year, when customers have mechanical problems arise, our company will strictly follow the following steps to be treated: in the form of telephone or fax the form of technical personnel to guide customers Failure of the judgment, and then go for guidance on how to deal with him, if only need to replace a part, then, our company will use the express way (wind Express) will be sent to the customer plant parts, but also when it comes to problems if other aspects of Division I will immediately send engineers to the factory for repair customers (in the province of customers), no more than one day event processing, engineers arrival time is not more than two days (Foreign customers). Costs: the warranty period, repairs involving all relevant costs borne directly by our company (including the cost of replacement parts, engineers, travel, etc.); after the maintenance period, our company will continue to follow these steps to resolve the problem, but All parts replaced our discretion to charge the fee, if there is to send engineers to the factory for repair, the customer must bear the travel and mission personnel to provide accommodation. Note: But you must be sure that: Our production equipment purchases from parts processing to the mechanical assembly, the engineering department has strict inspection checks to ensure the mechanical quality, so the failure rate is very low. After mechanical factory when customers encounter any difficulties, our company will provide hospitality for the first time an efficient and effective service to help customers deal with mechanical problems, and to ensure that customer's normal production process, after a year of maintenance time Later, all new customers, the factory also has trained a number of technical personnel, regardless of the performance of the machine itself or processing machinery maintenance problems, absolutely are very skilled, and will therefore need to send our engineers to plant maintenance little chance. 
Contact Detail
Company Name: Dongguan City Yuda Machinery Factory Express
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. DONG deceive(Sales)
Telephone Number: 0769-87937118
Company Address: No clear definition Road Tangxia Lake Management District 3 (next to Clear Lake head market), Dongguan City, Guangdong, China
Zip/Postal Code: 523000
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450