Kaifeng build drainage board
Kaifeng build drainage board
|
Kaifeng day build drainage board sales hotline: 182-6380-7657 Manager Xu look forward to working with you! 182-638-07657 company mainly produces and sells a centimeter drainage board, drainage board 1.2 cm and 1.5 cm drainage board, drainage board 2 cm, 2.5 cm drainage board, 3 cm drainage board, build drainage board 25, 30 build drainage board, 3.8 grass grid cm, 5.0 cm grass grid, 7.0 cm grass grid, 10mm drainage board, 12mm drainage board; 20mm drainage board; 25mm drainage board; 30mm drainage board, 150 g geotextile, geotextiles 200 grams, the company provides drainage board construction laying, welding train service. Drainage Board Products 182 * 6380 * 7657 drainage board is made of polystyrene (HIPS) or polyethylene plastic plate after punching cone penetration units made (or hollow cylindrical porous) from the top surface of plastic cone penetration units access a layer of filter geotextile to prevent soil particles through, thus avoiding drainage obstruction, so that smooth drainage. The traditional use of brick tile drainage as a guide filter layer, the use of more pebbles or gravel as a filtration layer, the water discharged to the designated place. Now replace the pebbles treatment layer with a drain to drain is saving time, effort and energy saving investment, but also reduce the load of the building. Drainage Board Features: 182 * 6380 * 7657 good drainage system in normal use and life cycle of construction and civil engineering structures play an important role. HW type Drainage Board porous tubes with an effective drainage system sparse, long and short cylindrical drain and geotextile form a drainage system, to form a water seepage, water and drainage systems. Drainage Board Applications: 182 * 6380 * 7657 garden project: garage roof greening, roof garden, soccer fields, golf courses, beach projects Municipal engineering: road embankment, subway tunnels Construction: building the basis of the upper or lower, basement and outside walls, roofing and insulation and other impervious Traffic Engineering: roads, railway embankment, dams and slope protection layer protocols laying drainage board, drainage board construction program: 182 * 6380 * 7657 1. Clean laying waste site, cement screed, so that there is no obvious site bump at the outdoor garage roof and roof garden need to find the slope of 2-5 ‰. 2. Green roofs and outdoor garage roof greening can be equipped with a porous pipe use, so can drain water discharged discharged concentrated near water pipes under or near the city sewer 182 * 6380 * 7657 3. ground water seepage in the basement, in Overhead floor above the foundation, which is done in front of the floor drain is to do one round projections downward, left around the blind ditch, up the mountain groundwater seepage flow into the surrounding natural blind ditch drainage board through space, then into the sump through blind ditch. The interior basement seepage water, the body can be laid on the building wall drainage board, round projections for the main walls, drainage board outside and then a layer of single-wall masonry or cement powder steel mesh to protect the drainage board, so space outside wall seepage board straight down the inflow blind ditch directly caused sump. 5. In any lot laying drainage board, must be careful not to let dirt, cement, sand and other trash into the front space of the drainage board to ensure the smooth flow of the drainage board space. 182 * 6380 * 7657 6. When the drain laying protective measures as well, the level or outdoor garage laying drainage board should backfill work in a timely manner as soon as possible, to prevent large wind in laying drainage board affect quality; and interior basement waterproofing to do as soon as a protective layer to prevent drainage board is damaged or things. 7. cohesive backfill is in need shop geotextile 3-5 cm above the sand is ideal, in favor of geotextile filtration; as backfill is a nutritive soil or light soil would no longer need to lay a layer of sand, the soil itself is very loose very easy treatment. 8. Drain in laying the right side and take the next 1-2 edge fulcrum, you can touch the bottom two together, the above use of geotextile overlap, as long as they do not enter the soil drainage board drainage channel can maintain drainage flow . Construction Drainage Board Notes: 182-6380-76571, in the dry, ventilated storage environment drainage board, to prevent exposure, away from fire. 2, please stand up or lie flat drainage protection board, not tilted or cross horizontal pressure, stacking height not more than three layers, avoid heavy heap pressure. 3, laying should be smooth natural downslope or according to the laying of water. 182-6380-76574, single shop geotextile lap guarantee 150cm, lap by glue or sand compaction avoid moving, and then backfill, the first layer of compacted backfill guarantee before the next step, stratified backfill must be compacted. 182-6380-7657 Contact phone: 18263807657, 15550833165,
Contact Detail
Company Name: | Limited sunshine build drainage board |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Wang Jun(General manager) |
Telephone Number: | 155-50833165 |
Company Address: | For Tai'an City Daiyue corner, Taian City, Shandong Province, China |
Zip/Postal Code: | 271000 |
Find More Related Products
- Surgical Instruments Taiwan..
- Express freight company in ..
- hdpe bellows _ Xiong Yu-tai..
- Yin MT safe where it Jiaxin..
- Magnetic ring
- What products to stretch ma..
- Jinding exhaust treatment d..
- Keqiao to Qiqihar logistics..
- How to reserve Heze porcela..
- Bellows Type | Bellows | Xi..
- HJD6000- background monitor..
- Zhanjiang geotextile manufa..
- Rubber softening oil, softe..
- 3132 Large Pink paint suppl..
- Express logistics company i..
- Yin MT will not harm the bo..
- Emergency system, the emerg..
- Motor vibration feeder
- Nanjing grass grid