Chengdu warm company Which is better?
Chengdu warm company Which is better?
Chengdu warm company how the election? I chose Chengdu Thai Yang comfortable home! A safe and comfortable home to warm Thai Yang design of heating systems and energy saving operation is the best way to realize the design is good or bad. In fact, the system design is the most important part, which includes not only the thermal load calculations, laying way to warm the coil spacing, length also includes ways to warm the equipment selection and competent. These are the core part of the heating system. Some Sichuan warm company in order to reduce heating equipment cheap signing intentionally, sometimes warm overheat because of heating equipment selection did not match the heating system or heat load calculation error. Such problems can also modify early discovery, once late, it is very troublesome, but also replacement of equipment. Second, Chengdu Thai Yang family warm and comfortable material Tai Yang comfortable home using European descent original machine imported from Germany Wall Boilers: Viessmann. As well as the famous Italian wall boiler: Smith. Are internationally renowned brands, big brands, trusted! Third, Thai Yang warm and comfortable home construction industry in Sichuan to warm it reads "third product, seven installation", which is to emphasize the importance of the installation, Chengdu Thai Young designers warm and comfortable home setting after drawing out the material site acceptance is completed, construction workers will be in strict accordance with the construction drawings and construction step begins. Fourth, Chengdu Thai Yang warm and comfortable home Young Thai commissioning engineer after all the construction is completed the system transfer operation, after the expiration of the concrete curing filling layer, before the formal use of heating operation. When the initial heating, keeping hot water slowly warming, water temperature should be controlled at the time than the ambient temperature 10 ℃, and should not be higher than 30 ℃; and shall run continuously 48h; 24h after every water temperature 3 ℃ -5 ℃, until the water temperature reaches design. As the temperature rises should be level for each group of watershed, catchment connected by road to adjust the heating pipe until it reaches the design requirements. Five Thai Yang warm maintenance arrived we insist 4:!!!! Chengdu endotricyclo four hours to reach the ring outside the eight hours to reach the outskirts of 12 hours to reach the province 24 hours to reach our resolve to adhere to two: three hours is not solve, for seven days did not spare boiler repaired, new machine Thai Yang comfortable consulting Commissioner:!! 18048594712 (Little Su) Web site address: www.taiyangcd.com [Chengdu Tai Yang comfortable home] Address: Chengdu Second West Loop section of the 5th attached to the 24th (Redstar 2 shop opposite)
Contact Detail
Company Name: | Chengdu Tai Yang Technology Co., Ltd. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Sioux City(Manager) |
Telephone Number: | 18048594712 |
Company Address: | Chengdu attached to the 24th West Ring Road section of the 5th, , Sichuan, China |
Zip/Postal Code: | 610000 |
Find More Related Products
- Tire Recycling, the global ..
- Rubber Factory waste recycl..
- PPS Compression raw physica..
- Shenzhen brand website
- Huzhou temple township hosp..
- Hitachi blower dealers, Eas..
- Dongguan logistics line to ..
- Live fingerprint access con..
- Jiangsu production gold med..
- Jiangsu price gold medal, g..
- Chongqing convex hull PVC k..
- Production of PVC paste _ C..
- Expo 2015 Shanghai Institut..
- Hitachi Hitachi blower blow..
- Security scribe marking tap..
- TP60I seok electronic Xianh..
- Million color jellyfish off..
- Elevator transformation _ T..
- How to lift, lift Datong an..
- Elevator transformation, Ta..