Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Tieling plugging underground garage project

Tieling plugging underground garage project
Tieling plugging underground garage project
Tieling plugging underground garage project

Larger photo of automa dispenser

Company:Jiangsu large waterproof plugging Engineering Co., Ltd.
Information Name: Tieling plugging underground garage project
Update Time:2014-11-13
Validity:365
Specifications:Tieling plugging underground garage
Quantity:234.00
Price Description: RMB/
Inquire Now
Tieling underground garage plugging plugging company specializing in 24-hour service hotline: (0) 13961999789 15862087268 Manager Zhou Jiangsu large waterproof plugging Engineering Co., Ltd., Jiangsu Province, the first batch of production safety management Safety Supervision Bureau qualifications a high flying operations class enterprises, Chinese anti-corrosion construction power system relevant professional qualifications two enterprises, Jiangsu Province basement plugging, plugging the tunnel, cesspool plugging company, culvert trap, plugging the pool, with water plugging, plugging the dock, mine plugging, cable channel plugging, plugging air defense projects, expansion joint sealing, joint sealing, plugging cracks off, pump plugging, settlement plugging, plugging the dam, underground engineering plugging, elevator shaft sealing, joint sealing, cooling tower plugging, plugging waterproof underwater plugging and other waterproof plugging! . Professional to provide you with: (a) culvert, settlement, expansion joints, Deformation, back strip, construction joints, cracks off the bottom leaking water sewage grouting waterproof plugging maintenance. (B) underground base construction, underground engineering, civil air defense projects, bank vault, floor sinks and other water leakage plugging construction of concrete structures. (C) mine passage, wellbore, caisson, dams, bridges, roofing, tunnel, culvert, drainage works take leakage shutoff maintenance. (Iv) coal mine coal handling system, threading pipe, casing, coal tray, drilling, well Wall, tailings culvert concrete cracks leak sealing. (E) the cable trench pit, cable tunnels, cable wells, elevator shafts, wells siphon valve shafts, foundation pit engineering leakage of water, with water plugging operations and construction. (Vi) basements, underground garage, parking, underground passages, heat pipes, excavation, shaft plugging leaks and other types of underground engineering repair and construction. (Vii) concrete structure, cooling towers, cooling towers, chimneys fouling platform, through pump house, plumbing, sewage treatment pond seepage water trap maintenance works. (Viii) highway tunnel, tunnel, cross-river tunnel, artificial lakes, water tunnels, railway tunnel mass concrete crack sealing leaks. ************************************************** ************************************************** Fundamentals ******************* waterproof plugging construction method used is chemical grouting. Chemical grouting is the use of manual or mechanical means to conduct with water plugging, under pressure, will be a special chemical grouting material poured into the cracks in the building structure, so that cracks in the grouting material solidified in order to achieve filling cracks and sealing purposes. Right through the cracks, can be taken seal joints, pipe, irrigation methods of treatment. For non-through cracks in the relationship because of breath, difficult to crack the slurry irrigation steeple area, and thus can not eliminate the stress concentration area formed by the tip region, so treatment should carefully consider various factors, improving slurry filling rate. For the temperature cracks, taking into account the concrete building on the temperature "lag effect", usually selected in the concrete body temperature lows grouting plugging leaks in water treatment, the better. . Grouting is a new chemical grouting plugging technology, which uses double grouts. Proportionally weighed three materials made from A fluid mixing water in proportion weighed Sulfur add water and stir into B fluid, when the two liquids mix after the polymerization reaction, the initial setting of 30 seconds, 2-3 minutes the reaction is complete, the final cemented colloids. Grouting injection structure layer using water-soluble form, low slurry viscosity, permeability, can be injected into cracks 0.1mm or less; slurry in the wet, the water speed large, multi-criteria under water condensation; gel also has good permeability, the case Water expansion, corrosion resistance and other characteristics, colloidal compressive 0.01-0.06MPa, tensile strength 0.02-0.04MPa. b. grouting method is mainly used in a large amount of water leakage, water dispersion, is not conducive to sealing cracks and individual water points, face. Crack sealing position is determined according to the situation. Internal grouting to seal the water channel and crack, or to make the water flow is relatively concentrated, easy closure. Leakage greater than 150mL / min, concentrated effluent point, grouting method using water shutoff. The first point on the water drilling, drilling depth so as not to penetrate the structure layer, preferably not less than 20cm, so can avoid slurry hyperdiffusion phenomenon, but also to clear the water points around the deep-rooted fine cracks appear when grouting, play relief role. Then float hole gravel ballast clean up mud with speed to the outside diameter of 25mm gel plastic hose buried water hole, and then trimming the mouth of the mortar. Jiangsu large waterproof plugging company is waterproof sealing technology research and development, one of the construction of an integrated enterprise. Has many years of experience in construction in recent years, the introduction of foreign advanced technology and high-performance waterproof plugging special hydraulic grouting equipment, imported high-tech nano micro molecular waterproof materials, new technology formulated scientific precision grouting plugging the buck, and efficient Plugging technological innovation, professional management of various underground leakage joints, especially for large volume concrete cracks, tunneling, settlement leakage has many years of experience in maintenance treatment, complete with the ability to tough waterproof plugging! Tieling plugging underground garage
Contact Detail
Company Name: Jiangsu large waterproof plugging Engineering Co., Ltd.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Chow()
Telephone Number: 0515-88281268
Company Address: Jiangsu Yancheng Middle East into the 8th, Yancheng City, Jiangsu Province, China
Zip/Postal Code:
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450