Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

30 tons of waste paper baler, 50 tons of waste paper baler, 60 tons of waste paper baler

30 tons of waste paper baler, 50 tons of waste paper baler, 60 tons of waste paper baler
30 tons of waste paper baler, 50 tons of waste paper baler, 60 tons of waste paper baler
30 tons of waste paper baler, 50 tons of waste paper baler, 60 tons of waste paper baler

Larger photo of automa dispenser

Company:Ichikawa kind Machinery Co., Ltd.
Information Name: 30 tons of waste paper baler, 50 tons of waste paper baler, 60 tons of waste paper baler
Update Time:2014-09-16
Validity:9000000
Specifications:100 * 650 * 1500
Quantity:1.00
Price Description: RMB/
Inquire Now
Product Features: This series of products are widely used in various types of printing, plastic plants, paper factories, metal works factory, the old material recycling companies and other business units, suitable for old things, waste paper, plastic and other packaging treatment and recovery, is to improve labor efficiency, reduce labor intensity, save manpower, reduce transportation costs, better equipment, there 5-10-15-30-50-60-80-100-120-150 ton nominal pressure and other specifications, and the other can be designed according to user requirements build. The role and use machines This machine is suitable installation considerations play scrap waste paper, waste plastic, plastic bottles, cans and foam packaging is a need, first machine flat, not shaken, then add 68 # hydraulic oil, according to different tonnage equipment plus different weight oil. 2, the mechanical and electrical machine is a four-pole 380V-50HZ, please checking with the local voltage is the same as the machine, connected to wires (wire size based on motor skill to pick) after close look at the power the motor rotation direction (indicated by the arrow) clockwise turn in the wrong direction when adjusting where two FireWire connection bit. The machine should be the person responsible for maintenance operations, maintenance, every day after work off the mains, clean up around the machine foreign body, foreign body to clean the machine, the active position with appropriate lubricants, reducing machine wear. Regularly check all parts of the machine screw is loose, the new machine is easy to anti-loose part are: small flange screw axis, the pressure plate 5/8 four large screws, regularly reinforced. First check the safety precautions before you start packing the doors are not closed, whether the lock heart buckle in place, whether buckle clasp knives, scissors, whether safety clasp on the handle. More than any part of the package is not buttoned Never, in order to avoid accidents. When the operation of machinery, man standing next to the machine, head, hands and body parts do not extend into the door, so as not to crush. Operation 1. After completion of the above checks start packing, first put a piece of cardboard or leather bags at the bottom of the packed room, film bag pad up, lay the bag for easy wear wire. Then put the waste into the packed chamber, attention put average, waste can not exceed packed room four weeks; beyond four weeks if the door is easy to bend, pressure deformation, a serious pressure off the main squirt heart. (Note: Place the waste can not be placed in packed indoor FLAC.) 2 Press the button to start the motor pump system switch ON. Position manual valve hit under the automatic platen press down until the plate Xiabu Qu, motor sound and the sound is not the same as when down, as in the pressure of the process required to pause, hit the middle of the manual valve, pressure plate suspended But this time the motor will continue to run. Pressure plate has to rise until the tailgate hit the upper limit switch platen drive automatically stops running when hit on the position of the manual valve. If you want to stop the operation of the machine, press the control switch OFF button to shut down the machine and the manual valve in the middle position. 3. packed press room in the package of material over the course of the pressure plate limit position, the pressure reached 150 kg / CM2 occurs when the relief role, keeping 150 kg of pressure, motor beeps Description pressures have enough to maintain the position of the pressure plate does not then press down. Such as packaging material does not meet the height, position manual valve hit on adding material so repeat until the packaging requirements. (Note: General packing height of 900mm, can not exceed 1000mm, there are difficulties in the package if it exceeds this height.) 4 when the manual valve hit the middle of the pack while pressing the OFF button to suspend the operation of the pressure plate to open the door wearing a wire the package. Open order: When people want to stand in front of the door before opening the door machine first, before re-opening next door, open the door when the next person to stand in the front of the 45 ° position, people try to point away from the machine, because when you open the door scissors buckle rebound great. Note that there is no other door around when people recognize only open when no other staff. Open the front door is open the back door with the same method. After 5 finish door, do not start to rise on the platen, the first wire go through the slot from the floor, wear out from the plate in the slot, in banding together with the wire ends, usually a package on 3-4 lashing wire is very firm up. 6. wearing a wire, starting with the bottom of the pit-bit front passes through, then go through the lower platen pit position, looped knot; wear a wire with the front side in the same way, wrapped wire, the rising pressure plate, to the top of the bag to overthrow it. Complete the packaging process. Machine failure and the reasons for Failure Analysis Solution The machine inability 1) Seal aging 2) pump damage (pressure oil temperature is too high, the pressure oil used for too long) 3) relief valve malfunction 4) motor voltage is not enough 380V 1) Replace the seals 2) Replace the pressure oil pump or replace 3) Cleaning or more pressure relief valve 4) Change the big deal with the central axis of the wire or an electrician spill a) axial seal damaged 2) Dafa blue O-ring damage 3) axial surface from pit damage 4) Small flange screws tight enough a) to replace the axial seal 2) replace Dafa blue O-ring 3) Replace the axis 4) small flange locking screw machine made loud one) is not enough hydraulic oil into the air 2) over pipe break in the air 3) through-tubing aging, over the amount of oil is not enough 4) oil filter clogging a) plus enough right amount of hydraulic oil 2) replacement tubing 3) replacement tubing 4) Clean or replace the oil filter machine malfunction 1 ) limit switch is damaged or bad 2) deduction system switch is damaged a) Replace the limit switch 2) Replace the deduction system switches the motor does not turn a) motor burned 2) AC contactor burn 3) deduction system switch is damaged or bad one) Replace the motor 2) replace the contactor 3) Replace the deduction system switches the machine fever, oscillation 1) hydraulic oil deterioration 2) prolonged exposure to high pressure 1) Replace the hydraulic oil 2) to reduce the pressure of time or the machine plus the cooler for maximum pressure 150 kg / CM2, the factory has been fine, do not exceed this range prone to danger, damage to the machine hydraulic system. This new machine to replace the use of hydraulic oil once a year, and thoroughly clean the bottom of the tank, then once every two years to replace the hydraulic oil. 
Contact Detail
Company Name: Ichikawa kind Machinery Co., Ltd.
Employee Number: 51 - 100 persons
Annual export: Below 500,000 CNY
Year Established:
Contact Person: Mr. Miss Lee(Sales Manager)
Telephone Number: 0755-84818158
Company Address: Industrial Zone of Longgang District, Shenzhen South about Baolong Lulihenglong, Shenzhen City, Guangdong, China
Zip/Postal Code: 518116
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450