Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Suzhou pool plugging

Suzhou pool plugging
Suzhou pool plugging
Suzhou pool plugging

Larger photo of automa dispenser

Company:Longtime altitude Engineering Co., Ltd. Jiangsu Ding
Information Name: Suzhou pool plugging
Update Time:2014-09-11
Validity:1000
Specifications:Suzhou pool plugging
Quantity:10000.00
Price Description: RMB/
Inquire Now
 Suzhou pool plugging leaking joints: First, ointment or other joints inside the foam filler to clean water stop with water to clean the joints in the joints catchy power after hammering into flash. . Masi close to filling joints with about 5 cm and then fill the joints with water will not leak. Embedded grouting mouth filling expansion joints in the process. A, Grooving and plaster plugging material effect very close relationship with the material for plugging technology to provide basic security conditions and plays the role of the superior performance of high-grade material eventually be reflected in the use of technology, no matter what material it and plugging technical operations must match fit. Therefore, this project waterproof, plugging the selection of materials for: special preparation and production of fast-setting expansion of plugging plugging polymer materials for repair; select leaking maximum leakage point as the center extends to both sides, with the impact hammer or artificial hewn V line groove, catchy 6-10㎝ width, depth 6-10㎝, V bottom for cracks, V trekking into the hose with a diameter of φ0.5-1 (card strip) Plastering buried were evacuated and grouting hole. Grouting hole spacing 80-150㎝, ensure grouting hole radius are superimposed. Second, the laying of grouting mouth: grouting mouth with a 4-6 PV pipe or cast iron pipe, buried line tank, clean, with a pair of fast or high-grade cement to cement grouting mouth firmly in line groove, depth does not less than 2-4㎝. Third, after a closed mouth leaking parts of the grouting buried, except for grouting mouth leaks, the other where there is water leakage or possible leakage sites (within a certain range) containment measures should be taken to avoid leakage of plasma, plasma phenomena run. Fourth, try Note leaks after grouting mouth closed and buried when a certain strength. When using color instead of an aqueous slurry injection test to calculate the amount of grouting, grouting time, provide a reference for determining the slurry mix, grouting pressure. While observing the situation and plugging the holes connectivity to ensure grouting normally. Five, installation and inspection of the installation and check the grouting equipment to ensure safe use of the grouting construction. Six, grouting choose one hole grouting (select larger packers and water leakage at the lower amount), to be porous to see syrup, immediately shut down the wells, continued grouting, grouting pressure should be greater than the leakage water pressure, the slurry along the seepage channel 迸 to advance, until no longer into the pulp, first off grouting mouth immediately and then stop grouting. After grouting, the grouting holes and inspection hole plugging dense. After the slurry is solidified, excluding grouting mouth to observe the effect of grouting plugging, grouting can be repeated if necessary. Now the roof, basement, roof Osaka and other issues such as water seepage stanch has been a big problem difficult to solve, but with the use of new products, new technology to produce new materials, such problems will no longer be difficult to resolve. Construction of a roofing project, the rainy season, the insulation layer contains a lot of rain, this emphasis is not caused by technical personnel to perform the procedure under construction. But before long roof leaks appeared, if re-do the insulation, waterproofing economic loss will be great. So engineers and technicians take the high-pressure grouting technology under the roof. http://www.dtgkgs.com Suzhou pool plugging our 24-hour service hotline: 15380582888 Contact: Manager Hu
Contact Detail
Company Name: Longtime altitude Engineering Co., Ltd. Jiangsu Ding
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Huzhong You(Manager)
Telephone Number: 0515-88015888
Company Address: 139 South New Tongyu Road, Yancheng City, Jiangsu Province, China
Zip/Postal Code:
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450