Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Dongguan basketball courts plastic runway | Sung Mao Sports | mixed plastic runway

Dongguan basketball courts plastic runway | Sung Mao Sports | mixed plastic runway
Dongguan basketball courts plastic runway | Sung Mao Sports | mixed plastic runway
Dongguan basketball courts plastic runway | Sung Mao Sports | mixed plastic runway

Larger photo of automa dispenser

Company:Dongguan City Sports Facilities Engineering Co., Ltd. S..
Information Name: Dongguan basketball courts plastic runway | Sung Mao Sports | mixed plastic runway
Update Time:2014-04-08
Validity:0
Specifications:Limitation
Quantity:
Price Description: RMB/
Inquire Now
Dongguan basketball courts plastic runway | Sung Mao Sports | mixed plastic runway provided by Sung Mao sports. Dongguan basketball courts plastic track, Sung Mao sports, plastic runway project is Sung Mao Dongguan City Sports Facilities Engineering Co., Ltd. (www.hx-sport.cn) 2014 upgrade been newly introduced plastic track and field, athletes access to the site should? Plastic track and field, generally Athletes training or assembly used to enter the venue for all staff to pay attention to the following matters: a variety of athletes shoes, running spikes, no more than 9mm, jumping spikes no more than 12mm. Training shoes, rubber-soled shoes unrestricted; various starting blocks, untested qualified products should not be used at the venue for practice with the starting blocks, allowing only 110m behind the starting line with practice; barbells, dumbbells, shot put, javelin plastic runway facilities and other equipment may not be used in the plastic track venues; scene layers on plastic track mixed plastic runway, shall still cigarette butts, chewing gum, and shall sprinkle sugary drinks. Football player, track athletics venue after picking up the ball of plastic should be in the game after use, the timely removal of mud and dirt. Track and field venues in the rubber sheet plastic runway, how thick zone pavement? Athletics competitions breathable plastic track, because the force of the athletes in different areas, so it is necessary to make special treatment technology, the IAAF gives some events, field ground layer thickening processing requirements need to be made. Different country in athletics competitions, has been referring to this requirement, such as the high jump area, the front of the long jump run-up track, the front of the runway in the pole vault, javelin throwing the front end of the runway, and the 3000m barriers such as pool side of the pool, game projects plane size thickened area is different, detailed dimensions, should IAAF requirements, and our track and field competition rules prevail. Rubber membrane is processed in the factory, one finished, so before construction design documents to be read, the specific requirements of design drawings, construction units to submit detailed plane size, thickness requirements, supply factory processing incoming request carefully checked and should be stacked separately, keeping up with the wrong prevent undue loss. 
Contact Detail
Company Name: Dongguan City Sports Facilities Engineering Co., Ltd. S..
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Mr. Jiang()
Telephone Number: 0769-28828025
Company Address: Dongguan, Guangdong Province wanjiang snakes Chung Ying Feng, Building B, 303/305, , , China
Zip/Postal Code: 523057
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450