Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

The supply sales Panjin polymer repair mortar

The supply sales Panjin polymer repair mortar
The supply sales Panjin polymer repair mortar
The supply sales Panjin polymer repair mortar

Larger photo of automa dispenser

Company:Dalian Ha Oude Building Material Co., Ltd.
Information Name: The supply sales Panjin polymer repair mortar
Update Time:2012-12-29
Validity:100
Specifications:25kg / bag
Quantity:1000.00
Price Description: RMB/
Inquire Now
★ Features ◆ good adaptability, strong bonding, dense old concrete base, good water seepage. ◆ of reinforced protective performance, corroded reinforcement can play a protective patch performance and good durability. ◆ construction in damp the grassroots or wet environment, partial repair can be carried out under conditions of non-stop production. ◆ convenient operation Province provincial workers in intensity gas corrosive environment, the alternative organic coatings, and simple, inexpensive compared to the resin material construction. ★ Application ◆ for industrial and civilian facilities in the buildings of reinforced concrete or cracking surface, panel, load-bearing columns, beams, external hand side patch, wet industrial, civil construction of the outer hand side decoration. ◆ used for the repair of cellular concrete, holes and other defects, damage the thin layer of concrete floor repair, as well as to do overall protective patch surface concrete, masonry or steel structures on the surface. ◆ for damage and repair can not meet the design requirements of industrial and civil buildings. Especially suitable for the repair of the floor panel and open sheet structure. ◆ used for anti-corrosion requirements of underground pipes, power plants, dry cooling towers, chimneys, chemical plant structures and a variety of corrosive gas plant building maintenance. ◆ This product is a "rope polymer mortar method polymer mortar. ◆ This product is a "highway, bridge repair leveling reinforced polymer mortar. ★ methods ◆ Primary treatment: the surface of the grass-roots clean and dust-free, oil-free, non-chemical corrosion medium residue. The surface of the porous material should be pre-soaked in water, steel grassroots surface rust should be removed. 2, there are leaks must first be processed 901 rapid plugging agent, it is best to keep the base water surface moist to ignorance prevail, in order to achieve a better construction. ◆ material preparation: 1, first glue poured into a bucket, and then in accordance with the glue: powder = 1:4 ratio edge stirring slowly adding powder and stir until evenly without caking mortar-like. 2, can be using mechanical stirring or manual mixing, good preparation mortar should be used within 2-3 hours. Construction and maintenance: EC2000 polymer repair mortar for the whole surface layer thickness should not be less than 3mm. When a construction area, construction joints should stay or slice stagger the construction. Each block of the area should not be more than 10-15m2, visual field environment. Fill joints or slice gap stagger the construction time should not be less than 24 hours. Do the whole surface layer on the surface of the concrete or masonry facade and steel structure, twice, and each time the interval should not be less than 24 hours. When the last hand side, once disappearing, and shall not be repeated wiping pressure. ★ Notes ◆ The product construction environment temperature was 10-30 ℃, should not be less than 5 ° C, raw materials shall not be exposed to moisture, rain, sun and debris contamination. ◆ This product is not on rainy days, frozen during the construction. If it is necessary to construction in the winter, you should take the necessary measures of antifreeze. With ◆ This product should be mixed with, not spices once too many, and each spices should be used up within 2-3 hours. ★ security matters ◆ construction required to wear gloves and goggles. Case splashed on the skin or eyes, immediately rinse with clean water. If there is inflammation, seek immediate medical attention. ◆ dry powder operation to be very careful in order to reduce the formation of dust. If the dust is too much, you have to wear a the visible face mask. ★ packaging and storing ◆ This product should be stored above 0 ℃ dry and ventilated place, avoid the sun, rain forests, damp, cold glue unopened shelf life of six months, powder unopened shelf life of 12 months . ◆ glue packaging specifications 10 kg / barrel, the the powder packaging specifications for the 40 kg / bag.
Contact Detail
Company Name: Dalian Ha Oude Building Material Co., Ltd.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Ding Xu(Sales Manager)
Telephone Number: 13940947772
Company Address: Dalian checkerboard sub Industrial Park, Dalian City, Liaoning Province, China
Zip/Postal Code: 116033
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450